Wiring is performed by service engineers of TETAMAT and includes power and signal cables from the control panel mounted on the platform to the respective units. There are also cable trays for keeping and organizing cable bundles.
The control panel is used for setting times, speeds and delays operation of the units in the system. Management offers several levels of access.